Public Works

Responsibilities

The Public Works Department is responsible for the following:

  • Street maintenance and construction
  • Garbage and brush collection and disposal
  • Water and sewer line maintenance and construction
  • Maintenance of parks, playgrounds, and cemeteries
  • Water turn-ons and turn-offs
  • Water meter readings for billing purposes

Fire Hydrant Flow Testing and Maintenance

March 20, 2017 

On Monday 27 March, a Public Works crew will begin semiannual testing and inspection of fire hydrants throughout the city distribution system. Testing should be complete by the end of the week, but may be delayed by emergencies or weather. If delays occur the work will be completed the week of 3 April. Maintenance consists of checking all valves for proper operation and identifying leaks. All work will be performed during normal work hours, 7:30 AM to 4:00 PM.

Read More »


Advertisement for Bids: Street Resurfacing

March 10, 2017 

The City of Lexington, Virginia will receive SEALED BIDS in the Office of the Department of Public Works, 890 Shop Road, Lexington, Virginia 24450, until Thursday, March 30, 2017 at 11:00 AM, for the “Spring 2017 Street Resurfacing Program”. This project includes 26,333 SY of City Inventory street milling and asphalt paving (nominal 2” SM-9.5A) and 7,726 SY of Non-Inventory street asphalt overlay (nominal 2” SM-9.5AL). Contingency units for undercut, #21A stone base installation, asphalt patching, #21A shoulder replacement, and installation of asphalt berms are included.

Read More »

Archives...
Top